The flooring is 100% operational and 100% assembled. I do need to run some gaff around the perimeter to keep it in place, but that has to wait until after I glue the Vcc line into place.
[X] Strip Cat 5 cables + Glue them to the panels with conductive epoxy
[X] Assemble flooring
[ ] Attach Vc to flooring
[REDACTED]
[ ] Cut 2x 1' of threaded pipe
[ ] Attach pulley rig to dimmers
[ ] Cut and crimp steel cable.
Oh man, it's so close I can almost taste it. It tastes like the floor, which, coincidentally, I've slept on the last 2 nights.
No comments:
Post a Comment