Wednesday, March 11, 2009

Progress Report

Started putting down the wood flooring on Sunday/Monday, then ripped them all back up last night, started taping down strips of fun foam, and putting the flooring bag down last night. It's tedious (see: I am the for loop.) but the results are quite satisfying.

Panels with some flooring


Even more satisfying is seeing them in action:
Daniel using the lights on top of the active panels
Daniel using the lights on top of the active panels
Daniel using the lights on top of of the active panels from the sensor's point of view
Daniel using the lights on top of the active panels as seen from the panel's point of view


[X] Strip Cat 5 cables + Glue them to the panels with conductive epoxy
[~50%] Assemble flooring
[ ] Attach Vc to flooring
[REDACTED] Recut 1 servo-box
[ ] Cut 2x 1' of threaded pipe
[ ] Attach pulley rig to dimmers
[ ] Cut and crimp steel cable.

No comments: